Patton Wind Farm Excavation
Horst Excavating was selected by Gemma Renewable Power, LLC to complete this wind energy project in Cambria, PA. The site would become home to 15 wind turbine generators, a collection system, and point of interconnection and collector substations.
Features:
- Infrastructure
- 10 Miles of Access Road
- Foundations
- Stormwater Management
- Sewer System
- Erosion Control
Project Details