Prior to the construction of the Columbia Crossing River Trails Center at the Columbia River Park, Horst Excavating was involved in laying the groundwork for what is now an exceptional outdoor recreation area along the Susquehanna River.
Installation of four cofferdams to replace a concrete boat ramp
Installation of new canoe/kayak launch area separate from power boats
Installation of two floating boat docks
Upgraded street lighting in the park
Removed existing asphalt in parking area
Installation of porous asphalt paving in parking lot
Standard concrete and porous sidewalks and walking trails were installed around the area which would eventually become the Columbia Crossing River Trails Center