New Access Drive from the High School to the Middle School
Track installation preparation included removing existing track surface, excavating 12 inches, grading and stone sub-base, and auxiliary draining around the track
Field installation preparation included removing existing grass field, excavating 3 feet and installation of stone/under drainage