Horst Excavating was selected by Gemma Renewable Power, LLC to complete this wind energy project in Cambria, PA. The site would become home to 15 wind turbine generators, a collection system, and point of interconnection and collector substations.
Horst Excavating was selected by Gemma Renewable Power, LLC to complete this wind energy project in Cambria, PA. The site would become home to 15 wind turbine generators, a collection system, and point of interconnection and collector substations.
Villanova University selected Horst Excavating as the Prime Contractor for this FIH Approved field. The
Horst Excavating was the single prime contractor of this multi-phased project that addressed overflow parking,
Horst Excavating was selected by the Pennsylvania Department of Transportation to complete the extension of